Saturday, 9 February 2013

(Day 135 or 4 & half months): Here are some updated pictures as to what has been accomplished so far. The handover date is provisionally end March 2013/first week of April. Can't wait to move and leave this old place.

Carpeted on the entire Ist floor.


Ensuite with double basin, shower and seperate toilet on the corner.


Ensuite shower.


Kids shower, basin and bathtub.


Ensuite with double basins.



Cnetral heating return air vent.


Didi and bahini. Uma carrying our venetian blind. All blinds have been ordered. Some received and some to be delivered in end March/April.


Walk in robe in master bedroom.


Garage door with remote control (we get two remote; paid extra for it).

9 comments:

  1. The entry highlights the progress of specific architectural details, such as the installation of windows and the beginning of surface rendering. It serves as a helpful chronological reference for anyone interested in the typical timeline and stages of building a modern family home from the ground up. Cedar city Fencing company

    ReplyDelete
  2. The entry highlights the progress of specific architectural details, such as the installation of windows and the beginning of surface rendering. It serves as a helpful chronological reference for anyone interested in the typical timeline and stages of building a modern family home from the ground up. concrete contractor in Jefferson GA

    ReplyDelete
  3. The author provides a detailed visual update of the master ensuite and walk-in robe as they approach the final handover phase scheduled for early spring. Check out more about Fence installation Prattville AL

    ReplyDelete
  4. This blog post captures the four-and-a-half-month milestone of a new home build, showcasing the completion of interior carpeting, bathroom tiling, and the installation of a remote-controlled garage door. The author provides a detailed visual update of the master ensuite and walk-in robe as they approach the final handover phase scheduled for early spring. Cedar City block wall contractor

    ReplyDelete
  5. This blog post documents the four-and-a-half-month mark of a residential construction project, focusing on the installation of interior fixtures and finishes. It highlights the progress of the master ensuite tiling, the addition of a walk-in wardrobe, and the installation of a new sectional garage door as the build nears completion. View more about Concrete Patio Clearwater

    ReplyDelete
  6. Check out Concrete Flooring Augusta. Seeing a project reach the four-month mark is a significant milestone that demonstrates steady progress toward the final design goals. It is rewarding to see the structural choices come together to form a solid foundation for the remaining aesthetic work.

    ReplyDelete
  7. Tracking progress with such detail is a great professional habit for ensuring that every phase of a build meets the required specifications. Concrete Contractor Port Saint Lucie
    It is rewarding to see a project move successfully from foundational work to the high-quality finishes that define a home.

    ReplyDelete
  8. Augusta Fencing Contractor | This blog post documents the progress of a residential construction project at the four-and-a-half-month mark, highlighting the transition from structural framing to interior finishing. The author shares visual updates on the installation of key architectural elements, showing how the initial design vision is beginning to take physical shape as the house nears completion.

    ReplyDelete
  9. Nice post! Documenting these stages is an excellent professional practice for ensuring that a high-quality build remains on schedule and meets all design specifications. It is rewarding to see a project evolve from its foundational stages into a functional and aesthetically pleasing home. Fence Company Johnson City

    ReplyDelete