Saturday 9 February 2013

(Day 135 or 4 & half months): Here are some updated pictures as to what has been accomplished so far. The handover date is provisionally end March 2013/first week of April. Can't wait to move and leave this old place.

Carpeted on the entire Ist floor.


Ensuite with double basin, shower and seperate toilet on the corner.


Ensuite shower.


Kids shower, basin and bathtub.


Ensuite with double basins.



Cnetral heating return air vent.


Didi and bahini. Uma carrying our venetian blind. All blinds have been ordered. Some received and some to be delivered in end March/April.


Walk in robe in master bedroom.


Garage door with remote control (we get two remote; paid extra for it).